
Works Minister, David Umahi, has directed contractors handling the Calabar-Ebonyi-Benue-Kogi-Nasarawa-Abuja Superhighway to open multiple work fronts and intensify construction activities. Umahi gave the directive at the weekend during an inspection of the ongoing project, stressing that contractors must deploy sufficient manpower and resources to accelerate delivery while ensuring that existing buildings along the alignment are protected. The […] Umahi orders contractors to open multiple work f
Key Takeaways
Center
Coverage blindspot: Reporting on this development is currently concentrated in other segments of the media landscape.
Coverage blindspot: Reporting on this development is currently concentrated in other segments of the media landscape.
Get every side of the week's biggest story in your inbox.
Evaluated across 1 reporting source (0% Left · 100% Center · 0% Right)
Historical editorial baseline for Daily Post Nigeria
Multi-factor accuracy index for Daily Post Nigeria and related desks based on verifiable sourcing and editorial standards.
Factuality: High 0%
Ownership: Daily Post Nigeria (Corporate)
Public conversation related to this story
Loading comments…