Lagos-Calabar highway has no single engineering design
The Minister of Works, David Umahi, has disclosed that the 750km Lagos-Calabar Coastal Highway has no single engineering design for the entire route.

Coverage across the spectrum
How we rate outletsThe story so far
- Vote Tinubu or lose Lagos-Calabar Coastal Highway.
- Lagos-Calabar Coastal Highway costs N7.5bn per km.
Who's reporting it
All 4 sourcesTimeline
3h ago
Daily Post Nigeria: Minister of Works, David Umahi has defended the cost of the Lagos-Calabar Coastal Highway, saying a standard kilometer costs N7.5 billion, a
2h ago
Daily Post Nigeria: Minister of Works, David Umahi, says the Lagos-Calabar Coastal Highway may not be completed if President Bola Tinubu fails to secure a secon
2h ago
Daily Post Nigeria: Minister of Works, Dave Umahi, has insisted that no land was grabbed to construct the Lagos-Calabar Coastal Highway. The minister spoke in r
1m ago
Punch Newspapers: The Minister of Works, David Umahi, has disclosed that the 750km Lagos-Calabar Coastal Highway has no single engineering design for the enti
Reader Discussion
Loading comments…



